89-1962 CITY OF ST. PAUL COU IL F E d" 7 ��/ (0 �
AMENDED FINAL ORDER
By
File No. 18568
<
. Votin� In the Matter of improving the followin streets with a bituminous surfaced
War roadway, concrete curb and gutte s, concrete driveway aprons and
outwalks, boulevard sodding and pgrade an existing street lighting
3 & 4 system to a lantern style street lighting system:
Aldine Street from ummit Avenue to Laurel Avenue
; Ashland Avenue from airview Avenue to Fry Street
Fry Street from ummit Avenue to Portland Avenue
Herschel Street from shland Avenue to Laurel Avenue
' Pascal Street from ummit Avenue to Portland Avenue
Pierce Street from ummit Avenue to Laurel Avenue
Portland Avenue from airview Avenue to Pascal Street
Saratoga Street from ummit Avenue to Portland Avenue
Amherst Street from rinceton Street to Wheeler Street
Cambridge Street from incoln Avenue to Summit Avenue
Lincoln Avenue from airview Avenue to Amherst Street
Macalester Street from ummit Avenue to 232 feet south of Lincoln Avenue
: Princeton Avenue from herst Street to Macalester Street and
Wheeler Street from rinceton Avenue to Grand Avenue.
Wheeler Street from ummit Avenue to Laurel Avenue.
` All to be known as the Portland/ ldine Area Street Paving and Lighting
i
� Project.
' 89-1697 a roved Sevtember 21, 1989
�
under Preliminary Order pp
G
The Council of the City of Saint Paul has cond cted a public hearing upon the above improvement, due notice
thereof having been given as prescribed by the City Ch rter; and
WHEREAS, The Council has heard ali persons, obj ctions and recommendations pertaining to said proposed improve-
ment and has fully considered the same; now, therefor , be it
RESOLVED, That the Council of the City of Sai t Paul does hereby order that the above-described im�rovement
be made, and the proper City officers are hereby directe and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the complet on of said improvement, the proper City officers shall calculate
all expenses incurred therein and shall report the same to e City Council in accordance with Chapter 14 of the City Charter.
COUNCIL PERSON Adopted by the Council: Date ��V 2 I �g
Yeas�Nays
Goswitz Certified P ssed by Council Secretary
Long _
Rettman In_Favor By G�-l�-�G
Scheibel /r�
Sonnen v Against
Wilson �01, 2 z �89 Mayor
1�
'� 198Q
��� DEC �
� .
p�gUSl�D D E C 91989
� ���. _ „ ;RE 11/15/8 � ��—���
DEPARTMENTlOFFICE/COUNCIL • DATE INITIATED
Finance Department/Real Estate 11/14/8 GREEN S�HEET' NO. �iN�Y�L��
CONTACT PER80M d PHONE DEPARTMENT DIRECTOR CITY OOUNpL
Peter White 298-5317 �� CITK ATTORNEY CITY CLERK
M Q7'BE OOUNpL N A B A 1 $ FOUTINB BUDOET OIRECTOR �FlN.8 MQT.SERVN:E8 DIR.
�Iust�e in �ty ��er�c's �� ce no �AY��QR��� � Council Research
TOTAL#►OF SIONATURE PAOES 1 (CLIP ALL L ATIONS FOR 81GNATUR� PUBLIC HEARING 11/21/89
^cno�REauES�o: Order to be amended to include " D ON STREETS" for Portland Aldine Area Paving &
Lighting Pro�ect. Hold public hearing for he 1990 Portland/Aldine CSSP Pro�ect and Street
Paving and Lighting Pro�ect to construct a eparated sewer system, water, & sewer service
connections, street improvements and a lant rn style street lighting system. File No. 's
RECOMI�N TIONS:MP�(N o►�(Rl COUNCN.COM REPORT OPTIONAL
-PLANNIN�COMMIS810N _dVIL SERVICE COMMISSION ��Y8T PHONE NO.
qB OOMMITTEE
A $T� Ward 3 & 4 c�MEr�s:
—°'�"���°�`� — RECEIVF�
SUPPORTS WIi1CH COUNqL OBJECTIVEI
INI1U1T1N0 PROBLEM,ISSUE,OPPORTUNITY(Who,Whet,When,Whsro,VVh�:
�Tl� C.4.EkK
ADVANTAOE8 IF APPROVED:
DISADVANTACiES IF APPROVED:
DISADVANTAOES IF NOT APPROVED:
�������� kesearch Genter
NOV 15198�
TOTAL AMOUNT OF TRAl�ACTION a 265�OOO �T/REVENUE BUDQETED(CIRCL.E ON� YE8 NO
FUNDINO SOURCE ASSeSSmentsun�863,000 ACTMTY NUMBER
iyyu c;lis t
FlNANqAI INFORMATION:(EXPLAIN)
The above monies is to cover the work in olved for the "Add on Streets" only. �W
: .. . �
NOTE: COMPLETE DIRECTIONS ARE INCLUDED IN THE GREEN SHEET INSTRUCTIONAL
MANUAL AVAILABLE IN THE PURCHASING OFFICE(PHONE NO.298-4225).
ROUTINQ OHDER:
Below are preferred routings for the five most frequent types of dxumeMs:
CONTRACTS (assumes authorized COUNCIL RESOLUTION (Amend, Bdgts./
budget exists) Accept. Cirants)
1. Outside Agency 1. Department Director
2. Initiating Depertment 2. Budget Director
3. City Attorney 3. Ciry Attomey
4. Mayor 4. MayoNAssistant
5. Flnance&Mgmt Svcs. Director 5. Ciry Council
6. Finance Accounting 6. Chlef Accountant, Fin 8�Mgmt S1res.
ADMINISTRATIVE ORDER (Budqet COUNqL RESOLUTION (all others)
Revision) and ORDINANCE
1. Activity Manager 1• Inftiating Department Director
2. DepaRment Accountant 2. Ciry Attorney
3. Department Director 3. MayoNAssistant
4. Budget Director 4. City Council
5. Cfty Cierk �'; .
6. Chief Accountant, Fin&Mgmt Svcs: `
ADMINISTRATIVE ORDERS (all others)
1. Initiating Department
2. City Attomey
3. MayoNAssistant
4. Gty Clerk
TOTAL NUMBER OF SIGNATURE PACiES
Indicate the#of pages on which signatures are required and a�perciip
each of these pages•
ACTION REQUESTED
Describe what the projecUrequest seeks W axomplish in either chronologi-
cal order or order of importance,whichever is most appropriate for the
issue. Do not write complete sentences. Begin each ftem in your list with
a verb.
RECOMMENDATIONS
Complete if the issue in question has been presented before any body, public
or private.
SUPPORTS WHICH COUNCIL OBJECTIVE?
Indicate which Council obJective(s)your projecUrequest supports by listing
the key word(s)(HOUSING, RECREATION, NEIGHBORHOODS, ECONOMIC DEVELOPMENT,
BUDGET, SEWER SEPARATION).(SEE COMPLETE LIST IN INSTRUCTIONAL MANUAL.)
COUNCIL COMMITTEE/RESEARCH REPORT-OPTIONAL AS RECIUESTED BY COUNCIL
iNITIATiNG PROBLEM, ISSUE,OPPORTUNITY
Explain the skuation or conditions that created a need for your project
or request.
ADVANTAGES IF APPROVED
Indicate whether this is simply an annual budget procedure required by Iaw/
charter or whether there are specific wa in which the City of Saint Paul
and its cftizens will benefit from this pro�action.
DISADVANTAGES IF APPROVED
What�egative effects or major changes to existing or past processes might
this project/request produce if it is passed(e.g.,traffic delays, noise,
tax increases or assesaments)?To Whom?When? For how long?
DISADVANTA(3ES IF NOT APPROVED
What will be the negative consequences if the promised action is not
approved?Inabiliry to deliver service?Continued high traffic, noise,
accident rate7 Loss of revenue?
FINANqAL IMPACT
Although you must tailor the information you provide here to the issue you
are addressing, in general you must answer two questions: How much is it
• going to cost?Who is going to pay?
U L____J _
,
i[L�Y A�Y.'��_��� .
v . � � � �
< � � `---��'---+ ` 1
i � -��'
` 3 � ' �_�
_\� � u � � � J
> J
� ; ` � J � <
��� u
/ � i� =
h '' �
� Z N
Y
Po1lTLANO
�
�
�
�
) ' L' 0 �-'�—
� �t W RAMSEY I
�' Ja ✓R.MICN SCM. '
' S'/3 ' a��
�i O q✓2.
' ' �
�I ' �
� ��M[0 ( 111JLOL
� � �N N
� - ��
� �� 00 I AVt.
� Q N
� � v
� Z e +
s P-9/ �
� ` ' �
� ��i� q su•�w v■
�a � Z �
o .� �
o, -� �
� C��C� � W
atA/ wv �
—' • (-11---1 f-11-1 1—it—I I--1 (-11-1
L E� N�
� StO�tN SEwE� ISSfSSMt,J'i� B.v�/DRRY
� PA✓lN6 � L/('r T/A/6 /MPRO�/EME.JTS
��� StOR�M SENER ce�/sT�P✓��ioN
ADP C�J S7QErt5
_ __ _ _ __ __
STREETS 0 BE IMPROVED
Aldine Summit to Laurel Macalester Summit to 232' S. of Lir.
Amherst Princeton to Wheeler Pascal Summit to Portland
Ashlar.d Fairview to Fry Pierce Summit to Laurel
Cambridge Lincoln to Summit Princeton Amherst to Macalester
Fry Summit to Portland Portland Fairview to Pascal
Herschel Ashland to Laurel Saratoga Summit to Portland
Lincoln Fairview to Amherst Wheeler Summit to Laurel
Wheeler Princeton to Grand
�
�-
��� �5
CITY OF ST. PAUL COUNCIL FILE NO. �I'7 �
��
FINAL ORDER BY � ';� ':�
r
iasba
File Na
Voting In the Matter of i�provtng ths foll �treets u3th a bit paving,
Ward concrsta curb and gattera, concrQ e drivavays and o� aad npgrade
3 � y u� ssistins atraet lig�rting sy�t to a Lat�ra st�l� Crset lfahtias
systess
A7.dine Street frcn Stuaait A to Laurel Av ;
Ashlsad Avsn� troa FaiMa7r ��neu to lrry 8t s�t;
Fry Streat fro� S�it A� e to Port Aw�nae�
Hsrschel Streat frvs As2►laad A aas ta Iaors �lvan�;
- la�ca]. Streat fro�t 3ni■riit A� to Port �is�;
Pisrca Strest fs� S�t A� �s to Ian 1 >vem�e;
Portlaad �it�one fros Pair►iev venu�a to cal Streat�
Ssrstc►�a Straet fra� S�ait A� to P rtland �isun� and
N�eeler Street fras Saa�it Av �na to nrel .venue.
�11 ts be kra�ea as the lortland/ dine Street Paving a� Lishting Froject.
�;
� O ��_�j!�
under Preliminary Order ���� approved ` � a /
The Council of the City of Sai Paul has condu ted a public hearing upon the above improvement, due notice
thereof having been given as prescrib by the City Cha ter; and
WHEREAS, The Council has eard all persons, obje tions and recommendations pertaining to said proposed improve-
ment and has fully considered t same; now, therefore be it
RESOLVED, That the uncil of the City of Sai Paul does hereby order that the above-described improvement
be made, and the proper Cit officers are hereby directed and authorized to proceed with the improvement; and be it
FURTHER RESOL ED, That upon the completi n of said improvement, the proper City officers shall calculate
all expenses incurred the in and shall report the same to t City Council in accordance with Chapter 14 of the City Charter.
COUNCIL PERSON Adopted by the Council: Date
OCT 3 " 1989
Yeas D1uDnd Nays
6o�li.ts Certified Passed.by Council Secretary
LOng
�ltt�l In Favor By
Sc�si�sl
So��A Against
Wilso�n Mayor
�.t .:r` .u.,y# �a �����j�-7�E',� .�.;` 0 .,.�r�^e�'� � ��� .. �r�. � ' £� �r .R f�
��p� :. �T ��f���,'��""!.^� _ � �. '^ �F .t �
���0 �' P sy. Y �j� ?`a� .� � M
� '��}��� .. � ' �K .• Ya 4,. .��. "i'TI . � .�_ . . . � �. ='� ?i.
. ,y - s
i . �� �� �:�T� � T� � ,. {t � !�
� C11`.'M OF�SF:'Pp►UL'�:y � C��L,� I�O .� .
t . _ � � �`t '�
, : � ,:�i��►��t o R.� � � � . � y � ,L :..r .�.� ��
A � �`' - •!- l'�. 4 �B ,��
� I' � File No. � a. x �
�- ' � - : '�
_ , , - .
� .. .: , - ; ;
s � . � . . �,a�
. V , ng ; In the Matter of �� t�i � �t i� , . ,
�- : � �,� � ���� �
� �.� ��`'��"� �t MI � _ � �
' ��'t. � �� � � � � `
:�� � ' . . � :-� .:1�' fp � .. �.� t�l� �
�� � �' �'=� ��� � �
��°w.�.� � � ; � ;;.,, �
�, ' . ..� ' � � ��
� ''� �:;.� a '-+�`� .,
� � ,� � �G � .
4(,. . -.,, ,r:, =� �: �
> �
., . .,, :. , - - .
, sc-
. , �ar,. . . , - , . .
-
�� � � � . . . � . .
;-p t �
�rf � ' �:, � ���'�""'R� �� � � �
�, �s+" '� ``- * _ �;� .:'�� .._ .:,.�� - �$.. � � ,:�i
'' r .�� � �; �.
:i: ,s
. � .� .a ,� ,. �. c:� `�
�: '
�� +� .. �,�,6•`Nj. � .�.� �+� l+ "�'' � _ ...��y h1
N y 4� � .�. . ° . ,. ��✓
x � �l,
p h���Y � �.� � �' .���s.������������F ���' YtS�A..±
il.. �,,,��rC _ { , 4
ry (����� � �. .: 1''�-.. � . � � . . � - . . _ �a4 :��
�d'�.! ;�." .,'i '.�/�, � . . E' - . ' .
M„ � .'"�� ' � � .. p � �', _�' � ,,
7 '� , '� ' � � , _ �
,,�: , � � . �, " a_ �,. ,+�n�
� • �
���. ,k�, �d��} .��z . .. rg�q�r . � . .. ._ .. . � � . . � . . - '3
v��. :4' \ ¢r =rTl`�'fSr..- . . - . . � � ! . . � . � - .��
r � �� .. . _ *� i� . �..,v� .. . t
�, 4MIY.-��-. .' , ��.. . ' . ' ..=,
� �.. � � . � ,... '; , ._._ ., .. , � . '' . � . � .,� - ,y;- .
t
_
un�e�relimi��tyfl�iier - approved �.`��� �� �
� ;
� ,
� ' _
� '
, _,
:
, _w <. . ,: � _. . _ ._ _ _ . .
i
T�ie Council of tl�e City� of Sai�t Paul has co�du ed a public hearing up�n the above impxovement, due srotice
thereof having been given as prescribed by,_t�e City �har r; a�td
WHEREAS, The Council has heard all,p�rsons, o �ec ior�.,�nd i�cot�tmendatioas pertaining �o said pro�siseil�im�rove-
ment and has fully considered the same; flow, theref�re, e it`
RESOLVED, That the Council of the City of 5aint Paul does hereby ordei that 1he above-described improvernent
be masle,and ihe proper City officers are hereby direc�ed ad authorize��`to proceed with the improvement;and be it
FURTHER=I�£SOLV�D, That upon the tomp�etio of said'irrlprovement, the proper City officers shall_calculate '
- all expenses incurred therein and shall report the same tb th City-Council i�,�ccordarice with Chapter 14 of the City Charter.
` > ` . 1 ,_
. I '
COUNCIL P�RSt�N � ; Adopted by the Gouncil: Date + `;' ` ±
Yeas D� Nays , � .
' � ' Certified P�(ssed by.Council Secreta�y , :
- . ..
, . , �'� _ . :
]� In Favor By
: �. � ; _ _ °
, � AF�� i '
. ,
,� .
�_ � _ ... _
, . F Mayor � .."
; � - ,
. ,; _.
,
� � � � � , � . : PO�R�"�.A D /AL�I�NE� ��-i9��
� � SEWER GONSTRUCTIotJ AND STREET PAV�NG �°�9�
90-S-8059 90-P-9d44
� � �STORM SEWER AND STRf�ET �•����ST4RM SEW�Fj A*IO RESTORE
IMPRovEMENTS IN A aAVEO STR T 6X15T�N6 STRfiET
���\57oRM SEWER AND STREET •�����STREET IM?ROVEMEt�TS �►�1 41J
IMPR(7vEM�ryTS IN AN 011,E0 STRE T oiLE� STR6ET
� � � ( ���C� ��'���-1 � � �---�
MARSNALL. �
� � � � �� �_ �
�+ �
— — SCM. �\ \
� �
� � J \\ AV
OA ut � � AY . �
I W Y �� � %
� � 3 - - �____.�y-� '
� �� SCLtY ► / / //
AV C �
d � \
� �u \\
� �o [�z o � � �
� � J l. R L J Q�"
�. � ra �
� • � � to u -- m�
� i4 Z J�—
� , • � „ �—•• A <�_
�����• • A9�A��
� � : � z z
� •
� �
� AV ■ ■ ._ ■ ■ ■ ��■■ TLA D
� � � �
1 ✓ �� ,�
� C
�� SUMMIT � � SUMMIT � �
� �
���SEr �
a �p M.��5�., E
s �� C
GRANO ` , ` � �
� � � �_,_,_ � � . 0 C
� — � �NC—� NC
C� C
BOOORiCH A V .
N C
� � C
J � C
� " C
�
C� ��p y . -C
�
�1 = C
�� C�I� T L IR W `--
�� �ononn � nn �-� �
. , � j,
�r " , . •SUMNfARY OF ENGIN ERING RECOMMENDATIONS li�`"'- a "�—����
�, • " PORTLAND/ALDINE ST RM SEWER&PAVING PROJECT
PROJE T N0. 90-S-8059
(INCLUDES -P-8044&90-V-8044)
NEIGH�ORHOOD INFORMA IONAL MEETING-
PUBLIC WOftKS COMMI EE MEETING-October 18,1989
PUBLIC HE ING-October 31,1989
, PROJECT:
Construct a storm sewer system, ater and sewer service connections and
reconnections, street improvements d upgrade an existing ornamental lighting
system in the Mississippi River Bo evard watershed. This area is bounded by
Fairview, St. Clair, Pascal and Selby.
EXISTING CONDITIONS:
The project area is presently served y a combined sewer system. During periods
of rainfall, storm water and sanit ry sewage are combined. Light rainfall,
combined with sanitary sewage, wil be directed to the sewage treatment plant
where the stormwater will be unnec ssarily treated. Moderate to heavy rainfall,
combined with sanitary sewage, will overflow diversion structures and untreated
sanitary sewage will outlet to the ississippi River. Reports of sewer backups
into basements and surface flooding ave also been noted in this area.
The following streets within the p oject area are paved with concrete base,
overlaid with asphalt and have concr te curb:
SELBY-HERSCHEL TO PIER E
PORTLAND - FAIRVIEW TO ASCAL
SUMMIT - FAIRVIEW TO SN LLING
LINCOLN - FAIRVIEW TO HERST
FAIRVIEW - LIN�OLN TO UREL
WHEELER - ST. CLAIR TO D
AMHERST - PftINCETON TO WHEELER
CAMBRIDGE - LINCOLN TO UMMIT
MACALESTER - LINCOLN T SUMMIT
SNELLING - LINCOLN TO S MMIT
The following are bituminous streets with concrete curb:
LAUREL - HERSCHEL TO AL INE ���
PRINCETON - AMHERST TO MACALESTER
HERSCHEL- LAUREL TO H UE
ALDINE - LAUREL TO SELB
PIERCE - LAUREL TO HAGU
The following are oiled streets with i termittent sections of concrete curb:
ASHLAND - FAIFtVIEW TO F Y
WHEELER - SUMMIT TO LA REL
HERSCHEL - ASHLAND TO UREL
ALDINE - SUMMIT TO LAU L
PIEftCE - SUMMIT TO LAU L
FRY - SUMMIT TO POftT D
SARATOGA - SUMMIT TO P RTLAND
PASCAL - SUMMIT TO PORT D
. - .. � � � ; ' . . . . . . �"�y'-�9��.
. .
Th� project area'currently has an ol series ornamental lighting system.
PROPOSED IMPROVEMENTS:
Street improvements and storm sew r construction are proposed for the following
streets:
ASHLAND - WHEELER TO P ER.CE
PORTLAND - FAIR,VIEW TO PASCAL
' WHEELER - SUMMIT TO A,5 LAND
HERSCHEL - ASHLAND TO UREL
ALDINE - SUMMIT TO POft AND
PIERCE - SUMMIT TO PORT D
PIERCE - ASHLAND TO LAU EL
SAR.[�1TOGA - SUMMIT TO P RTLAND
PASCAL - SUMMIT TO POR AND
Storm sewer construction and tr ch restoration only is proposed for the
following streets and alleys.
SELBY- HERSC�-iEL TO PIER E
LAUREL - HERSCHEL TO AL INE
SUMMIT - WHEELER TO 400 EAST
SUMMIT - PIERCE TO SNEL ING
LINCOLN - FAIRVIEW TO HERST
PRINCETON - AMHERST TO MACALESTER
FAIRVIEW - LINCOLN TO P RTLAND
FAIRVIEW - ASHLAND, NO H TO ALLEY
WHEELER - ST. CLAIR TO S GENT
WHEELER - PRINCETON T GRAND
AMHERST - PRINCETON TO WHEELER
CAMBRIDGE - LINCOLN TO UMMIT
MACALESTER - LINCOLN T SUMMIT
SNELLING - LINCOLN TO S MMIT
ALLEY E. OF FAIRVIEW - B TWEEN LAUREL AND ASHLAND
ALLEY E. OF WHEELER - B TWEEN ASHLAND AND PORTLAND �
ALLEY E. OF WHEELER - B TWEEN GRAND AND LINCOLN
ALLEY S. OF PRfNCETON - ETWEEN VERNON AND MACALESTER
HERSCHEL - LA�TREL TO H UE
ALDINE - LAUR �'L TO SELB
PIERCE - LAUREL TO HAGU
Street improvements, but no sewer construction, is proposed for the following
streets:
ASHLAND - FAIRVIEW TO HEELER
ASHLAND - PIERCE TO FRY
WHEELER - A,SHLAND TO UREL
ALDINE - PORTLAND TO REL
PIERCE - PORTLAND TO AS LAND
FRY - SUMMIT TO PORT D
Street widths will remain the sam except for the proposed widening of the
following streets, from 30' to 32' wide
FRY - SUMMIT '^0 PORT D
SARATOGA - St,'iVIMIT TO P RTLAND
2
. � � - � � . � � . . . . (,J,������
Nc. street �vvider�ing will be perfor ed if interference with boulevard trees is
' : � encountered. New curb will be ha d formed, if necessary, to avoid damaging
trees and/or tree roots. Although tree removals are planned, tree trimming
may be necessary at some locations facilitate sewer construction.
The new storm sewer construction s part of a long-range storm sewer project
� which will result in separate storm and sanitary sewer systems throughout the
city.
� The street improvements propo ed would compliment the storm sewer
construction. New bituminous road ays with concrete curb and gutter are being
proposed. All driveways will be re onstructed with concrete and new concrete
outwalks will be constructed for ea h home. Boulevards will be regraded and
sodded. The old series lighting sys em would be retrofitted with a new sodium
vapor lighting system.
ALTERNATES:
To do nothing would be inconsiste t with the city's commitment to improve
existing oiled streets and improve w ter quality and reduce pollution. Improving
the roadways in conjunction with se er construction, will save time, money and
inconvenience later.
POSITIVE BENEFITS:
With the completion of the city' sewer project and the disconnection of
rainleaders, sewer backups into ba ements will be eliminated, surface flooding
reduced, and the diversion of sanita sewage to the Mississippi River, as well as
the diversion of storm water to the s age treatment plant, vv�ll be eliminated.
General improvement of the publ c right-of-way in conjunction with sewer
construction will enhance and add uality to the neighborhood. Street oiling
would be eliminated.
ADVERSE EFFECTS:
Normal problems associated with onstruction, such as noise, dust, reduced
access to property and general d sruption, will be present. However, by
constructing all improvements at his time, future adverse effects would be
eliminated.
COST ESTIMATES:
�8059 PORTLAND/ALDINE S ORM SEWER
Construction $2,2�0,000
Engineering & Insp ction 415•000
Total $2,655,000
P-8044 POftTLAND/ALDINE G ING & PAVING
Construction $465,000
Engineering & Insp tion 95,000
Miscellaneous 46,000
Total $606,000
3
. � �• � • ' . • • � M . . , � • ' • ��I/I ��
�� (�
" - V 8044 PORTLAND/ALDINE IGHTING
Construction $200,500
Engineering & Insp ction 37•100
Total $237,600
PROJECT TOTAL $3,498,600
� ESTIMATED FINANCING:
5-8059 PORTLAND/ALDINE ORM SEWER
Assessment $ 64,000
MnDOT 98,000
State & Federal Gra ts & Loans 1,716,400
Sewer Revenue Bon s 776.600
Total $2,655,000
P-8044 PORTLAND/ALDINE ING & PAVING
Assessment $162,000
CIB (1990) 292,000
Sewer Revenue Bon s 152 00
Total $606,000
v-so44 PORTLAND/ALDIN LIGHTING
CSSP $36,600
Series Conversion F ds 201•0�
$237,600
PROJECT TOTAL $3,498,000
SOURCE OF ADDITIONAL INFORMATIO :
For additional information, contact Jo Mueller at 292-6149.
RECOMMENDATION:
The Department of Public Works opi 'on is that this is a necessary and worthwhile
project and the Engineering Recom endation is for approval of the project and
financing.
Respectfully submitted,
Donald E. Nygaard
Director of Public Works
4
_ _ _ �' � . _- . ,��
� , �� ;�(_ � ���-� ��`
�p � - �
�� � ,,
�� '
,_,;
9. 12/5/89 Final Order: Imp ving the following Laid over to
streets with a bit minous surfaced 12/6/89
roadway, concrete urb and gutters,
concrete driveway prons and outwalks,
boulevard sodding nd a lantern style
street lighting sy tem. Parts of
Pinehurst, Yorkshi e, Hampshire Ave. ,
Hampshire Court, C lvin and Hilltop Lane.
To be known as the FAIRVIEW/MONTREAL AREA
STREET PAVING AND IGHTING PROJECT.
10. 12/5/89 Final Order: For onstructing the Laid over to
FAIRVIEW/MONTREAL REA STORM SEWER 12/6/89
PROJECT. Area is ounded by Eleanor on
the north, St. Pau Avenue on the south,
Howell and Fairvie on the west and Davern
on the east. Also constructing sanitary,
storm or water ser ice connections if
requested by prope ty owners.
11 . Final Order: For onstructing the Approved 3-0
PORTLAND/ALDINE AR A STORM SEWER PROJECT.
Area bounded by Se by, Fry, Princeton, and
Fairview. Also co structing sanitary,
storm and water se vice connections if
requested by prope ty owners. (Laid over
in Committee 10/18 89) .
12. ,!j/� v �,; Final Order: For mproving the following Approved 3-0
streets with a bit minous surfaced
roadway, concrete urb and gutters,
concrete driveway prons and outwalks,
boulevard sodding nd upgrade an existing
street lighting sy tem to a lantern style
street lighting sy tem: Parts of Aldine,
Ashland, Fry, Hers hel , Pascal , Pierce,
Portland, Saratoga and Wheeler. To be
known as the PORTL ND/ALOINE AREA STREET
PAVING AND LIGHTIN SYSTEM. (Laid over '
Committee 10/18/89 .
13. 12/5/89 Final Order: Acqu sition of certain Laid over to
property for the W STERN/ATWATER PONDING 12/6/89
PROJECT. (Laid ove indefinitely by
Council 8/29/89) .
14. 12/5/89 Council Resolution To consider the Approved 3-0
increase for the S wer Availability Charge
(SAC) for 1990 fro $575.00 to $600.00.
. � . _ . _ _
15. Resolution 89-1939: An ordinance amending Laid over
Chapter 157 of the Legislative Code by until
deleting in its entirety Section 157.08 12/6/89
which prohibits vehicles standing on a
street with a "for sale" sign. (Referred
to Committee 10/26/89) .
16. Discussion: Snowbird tagging and towing. Laid over to
12/6/89
17. Resolution: An Ordinance amending the St. Laid over to
Paul Legislative Code by adding a new 12/20/89
chapter pertaining to the franchising of
communications systems. (Laid over in
Committee 7/19/89) . (To be laid over for
1 month) .
18. Resolution 89-1783: An ordinance amending Laid over to
157.15(1) of the Legislative Code February or
pertaining to miscellaneous parking March
restrictions and allowing "curb jumping"
during the State Fair. (Laid over in
Committee 10/18/89) .
� � : � � ��_i���
P$EL MINARY.ORDER
Council File No. 89-1697-By Bo Long,Kiki Sonnen—
In the Matter of improvi�g t following streets with a bituminous paving
concrete curb and gutters, conc te driveways and outwalks and upg�ade an
existing street lighting system to lantern style street lighting sqstem in`Voting
Wards 3&4:
Aldine St. from Summit Ave.to urel Ave.;
Ashland Ave.from Fairview Ave.to Frq St.; �
Fry St. from Summit Ave. to Po and Ave.; —
Herschel St. from Ashland Ave. t Laurei Ave.;
Pascal St. from Summit Ave.to P rtland Ave.;
Pierce St. from Summit Ave.to urel Ave.;
Portland Ave. from Fairview Ave to Pascal St.;
Saratoga St.from Summit Ave.t Portland Ave. and
Wheeler St. from Summit Ave.to urel Ave.
All to be known as the Portland/ ine Area Street Pavfng and Li�p�j�,
The C�uncil of the City of$sin patil having received the repdrta�tbc�seyor
upott the above improvement, having consider� said �, ��y
zesolves:
� 1. That the said report an the sarrie is hereby aPA ^�. Me1th no
alternatives,and that xhe i�abed cost.thereof is�843}600, ' �
Assess:nents$162,000;Capi ol Improvement Bonds 199Q SeWeT
Revenue Bonds $152,000: ombined Sewer Separatiop- . ,Fuinds
a36,600 and Series Conwers n Ftsgds$201,000;
2. That a public hearing be d on said improvement on ' 's t da og
October, 1989, at 9:OU o'cl s.m., in the Council Chamb�. y
a an our ouse n in the City of Saint,Paql.
3. That notice of said pu�lic arjng be given to thQ�ersoqe ai►d it�the
manner pmvided by th� rter, stating the time snd pl�;�hearing,
the nature af the impro�r t and the total cost thereof�fe:�Umatecl,,
File No. 18568
Adapted by the Counrii Sep 21, 1989: �
ApFroved September 22, 2�9B9. _ •
_ (Septetnbe 30-0ctober 7, 1989)
: . . : -- � ���_,���
_ _ _ _
_ _ _ _ _..._ _
P A�Y O�llES _ ---
Council File No.89-1697—By Bob ,Kiki Sonnexs= ' '
' In the Matter of improvittg the fo lowing streets with A bituminous paviag, �
� concrete curb and gutters, concrpte� riveways and outwaiks and upgi�ade an !
existing street lighting system to a la tern style street lighting system in�otitt� ;.: ;
Wards 3&4: .
Aldine St. from Summit Ave.to Lau Ave.; '
Ashland Ave. from Fairview Ave.to ry St.; '
Fry St. from Summit Ave.to Portlan Ave.; .
Herschel St.from Ashland Ave. to L rel Ave.;
Pascal St. from Summit Ave.to Fort d Ave.;
Pierce St. from Summit Ave.to Lau 1 Ave.; �;
Portland Ave. from Fairview Ave.to ascal St.;
Saratoga St.from Summit Ave.to P lsttd Ave. and
Wheeler St.from Summit Ave.to La el Ave. ,
� All to be known as the Portland/Ald' Area Street Paving and Lfghti��ject.
The Council of the City of Saint P having received the report ot t�Mayor
; upon the above improvement, an having considered said repwott,:�ereby
' resolves: ; ;:
1. That the said report and e same is hereby appropa#..�rtth no
• alternatives,and that tfie,esti ted cost thereof is i843,600�'��by
Assessments$162,000; Capitol Improvement-Bonds 1�9Q�i� Sewer
Aevenue Bonds $152,000; Co bined Sewer Separation �' a Funds
�36,600 and Series Conversion s�201,000.
2._ That a public hearing be had on said improvement oa; tb�e 33atF � of
� October 1989 at 9:00 o'clock .m., ia the Council Chambe�._o e ty
an ou House Buil in the City oi Saint Paul.. -
9. That notice of said public ring be given to the persott�•s�d it� t�s -
� manner provided by the er, statin�.the ti=ne and�1�4�e 4�h�riag, .
the aature of the improve#nen and the total cost thereoi aiS�a�imated:
File No. 18568
,t�do�ted by the Council Septekm 21, 1985;
' Ap�ssawwed September 22. 1989:"
' . (Septemhex' October 7� 1989) . :
, , .. : , - • �� -����
- �
6. 10/31/89 Final Order: For mproving the following Laid over to
streets with a bit minous roadway, 11/1/89
concrete curb and utters, concrete
driveway aprons an outwalks and upgrade
an existing street lighting system to a
lantern style stre t lighting system:
Parts of Aldine, A hland, Fry, Herschel ,
Pascal , Pierce, Po tland, Saratoga and
Wheeler. To be kn wn as the
PORTLAND/ALDINE AR A STREET PAVING AND
LIGHTING PROJECT. Also, storm, sanitary
and water connecti ns, if requested by the
property owners, w 11 be constructed.
7. Vacation: Propose vacation of Lots 27 Approved 3-0
through 30, Block Aurora Addition for
property at 1889 a d 1895 BUSH AVENUE.
(Laid over in Comm ttee 8/30/89 and
9/20/89) .
8. Resolution 89-1714 Approving the Approved 3-0
appointments of ine bers to the TOXIC
CHEMICAL TASK FORC . (Referred to
Committee 9/26/89)
9. Resolution 89-1715 Removing residential Laid over to
permit parking res riction on both sides 11/1/89
of WILDER between ayton and Selby, and
both sides of MOOR between Laurel and
Selby. (Referred o Committee 9/26/89) .
10. Resolution 89-1691 Petitioning the Approved 3-0
Minnesota Transpor ation Board to
determine cost sha ing for signal
relocations on the Chicago and North
Western Transporta ion Company crossing of
AMES near FLANDRAU
11 . Resolution 89-1469 Authorizing District Laid over to
Councils to use fu ds allocated for 11/1/89
neighborhood clean up projects in addition
to NEIGHBORHOOD CL ANUP DAY and that
District 15 Commun'ty Council is
authoriZed to util 'ze its Neighborhood
Cleanup allocation for printing and
distribution of so id waste reduction and
recycling brochure. (Referred to
Committee 9/21/89) .
. . . , r
+ ' . Members: `
` CITY OF �AINT PAUL Roger J. Goswitz, chair
�
� ,,,,��,,,,, Janice Rettman
• i„�� ��;�� OFFIGT OF TFIE CITY COIINCIL Tom Dimond
Date: October 18, 1989
Committee Report
To: Saint Paul City Council
From :Public Works, Utilities, and Transportation
Committee
Roger J. Goswitz, Chair
1 . Approval of minutes of October 4, 1989. Approved 3-0
Hearing Date
2. 10/31/89 Ratification Approving Award of Damages: Approved 3-0
Condemning and taking a permanent utility
easement for the ARCADE/MINNEHAHA AREA
SEWER SEPARATION PROJECT.
3. 10/24/89 Final Order: For constructing the Approved 3-0
JESSAMINE/FRANK AREA STORM SEWER PROJECT.
(Bounded by Maryland on the north, York on
the south, Cypress on the west, and
Barclay on the east) .
4. 10/24/89 Final Order: For improving the following Approved 3-0
streets with a bituminous roadway,
concrete curb and gutters, outwalks,
driveway aprons, boulevards will be
reconstructed and sodded and a lantern
style street lighting system will be
installed: Parts of Geranium, Jessamine,
Magnolia, Cook, Jenks, Frank, Duluth,
Atlantic, Magnolia Lane, Lane Place and
Burnquist. To be known as the
JESSAMINE/FRANK AREA STREET PAVING AND
LIGHTING PROJECT. Also, storm, sanitary
and water connections, if requested by the
property owners, will be constructed.
5. 10/31/89 Final Order: For constructing the Laid over to
PORTLAND/ALDINE AREA STORM SEWER PROJECT. 11/1/89
(Bounded by Selby, Fry, Princeton and
Fairview) .
CITY HALL SEVENTH FLOOR SAINT PAUL, MINNESOTA 55102
�ae