89-1406 CITY OF ST. PAUL C NCIL FILE NO. �'y ,
PRELIMINARY ORDER � .���'�/ �
Y �" 1
File No. 58969 and S8970
Voting In the Matter of
WARD __ __ .
� 58969 Sidewalk const uc ion (NEW) and reconstruction on
the East side ir ingham Street from E. Seventh
Street to York Av nue and on the West side Bi�mingham
Sta�eet f�om E. Se enth Street to Case Avenue and on
the South side C se Avenue from C1aFence Street to
Birmingham Str et
2 58970 Sidewalk Feconstr ction with Integral Curb on the
Southeast sid . Seventh Street f �om Walnut Street
to Ramsey Street t 270 W. Seventh St�eet .
- .�,.�.v� Y�z as,,..,, a...._, --r-------
_ -
ft . Foa a 6–foot wide sidewalk New construction , $ 15. 60 pea -
front ft. ; �eplacement of old side a k, $7. 80 pea faont ft.
All corne� �cesi.dential propeaties w �.1 receive a credit up to the
fisst 150 feet of new or reconst ct d sidewalk along and abutting the
"�ong side" of the p�operty.
COMMERCIAL aates (a�l pa�operty o he than a�esidential )
100% of actua� cost estimated to e appa�oximately $4. 00 per squa�e
foot of wa�k const�ructe�.
The Council of the City of aint Paul having r eiv d the report of the Mayor upon the above improvement, and
having considered said report,hereby resolves:
1. That the said report and the same is hereby ppr ved with no alternatives, and that the estimated cost thereof
is$*See above fo�'financed by asse sm nts.
construction costs and rates
2. That a public hearing be had on said improve ent n the 26th day of�:nrPmhPr, 1 9Rg ,at
nine M�4�o'clock a.m., in the Council Chambers f t e City Hall and Court House Building in the City of Saint Paul.
3. That notice of said public hearing be given t the persons and in the manner provided by the Charter,stating the
time and place of hearing,the nature of the ' pro ement and the total cost thereof as estimated.
AUG 1 01989
COUNCIL PERSON Adopted by the Councff: Date
Yeas Dimond Nays
Goswitz Certified ssed by Council Secretary
—��
Rettman � In Favo By
Scheibel �
�n,,� Against L���
Wilson Mayor
A 7 0198A.
PUSi!�� AUG 1919$9