Loading...
89-987 �� / CITY OF ST. PAUL COUNCIL FI NO. '� PRELIMINARY ORDER By File No. S 949 thru S8954 VAt'tn� In the Matter of sidewalk recoastructio a d construction at e following Ward locations: 7 S8949 East side Barclay S reet from Conway �' reet to E. Third S � reet � �� 7 S8950 Both sides N. Howar treet from E. S venth Street o tillwater Avenu 7 S8951 Both sides Lake St ee from Bush Aven e to E. Seve t Street 7 S8952 North side Manitou A enue from Iroqu s Avenue to N. Ruth S reet and West si e N. Ruth Street rom Manitou Avenue to Sti lw ter Avenue 7 58953 North side E . Sevent Street from R ilroad Bridge to Nor h Street. (with ; ntegral Curb) 7 S8954 South side E. Thi d Street from Kenn rd Street to Flandr u Street. ���.. ............ ... ..._ � -., — --- .. - __ - _ _ --- - - _ _ having considered said report,hereby resolves: 1. That the said report and the same is hereb ap oved with no alternatives, d that the estimated cost thereof isX *See Above , financedby ass ss ents. • for construction costs an r tes 2. That a public hearing be had on said impro me t on the �,..1+-h da of r�,i�i c�.go__,at nine �o'clock a.m., in the CouncIl Chamb rs o the City Hall and Court Ho e Building in the City of Saint Paul. 3. That notice of said public hearing be give to e persons and in the mann provided by the Chazter,stating the time and place of hearing,the nature of th im rovement and the total cost ereof as estimated. COUNCIL PERSON Adopted by the uncil: Date a7V� — } � Yea�imond Nays Goswitz Certified ssed Council S retary Long Re t tman In av By Scheibel Sonnen � A ins v Wilson Mayor .�1 - 51g80 �UBl1Si�D .'"N 1 01989