90-658 ! �
`�i��' �'
CITY OF ST. PAUL CO NC LE NO. Ur
FINAL ORDER r f � / � -�:' •
gy �'Qf��/i��G��:..��,..
File No. S90Ii, S9Q15 and 39016
;
Votiny In the Matter of �
Wsrd � �
Sidewalk Reconstruction at the following locations :
4 S9014 Both sides Albany Avenue from N. Pascal Street to
Arona Street
4 59015 North side Como Avenue from N. Hamline Avenue to
N. Pascal Street
4 59016 Both sides Holton Street from W. Nebraska Avenue to
W. Arlington Avenue
_ _ ------- -------- r--�----__---�__ ,�_« ,. �����__� y.�- y�a
first IS� feet of nev or recoestocted sidevalk along a$d sbattiug the
"long side" of tbe progerty.
COMKBI�CIAL raEea (sIl propertr other thaa resideatial)
i0�-of •ctnal coat estiaatad to be apprexf�atel� $4.OQ per a��are �
fost of walk constructed. �
�
� Q �
under Preliminary Order �0��� � approved ���3 �`�
�
The Council of the City of Saint Paul has conducted a public hearing upon the above improvement, due notice
thereof having been given as prescribed by the City Charter; and
WHEREAS, The Council has heard all persons, objections and recommendations pertaining to said proposed improve-
ment and has fully considered the same; now, therefore, be it
RESOLVED, That the Council of the City of Saint Paul does hereby order that the above-described improvement
be ma.de, and the proper City officers are hereby directed and authorized to proceed with the improvement; and be it
FURTHER RESOLVED, That upon the completion of said improvement, the proper City officers shall calculate
all expenses incurred therein and shall report the same to the City Council in accordance with Chapter 14 of the City Charter.
COUNCIL PERSON Adopted by the Council: Date APR �. 9 1990
Yeas Df��� Nays
��t� Certified Passed by Council Secretary
Long _
�� � In Favor B 6LC�ti
� v Against
R�zeon APR 2 3 199�ayor
!'tl�tiSHED APR 2 8199Q
. . . �ya ���
_ �. . .
SUMMARY OF ENGINEERING RECOMMENDATIONS
PROJECT: RECONSTRUCT SIDEWALK B.S. ALBANY AVE. from N. Pascal St.
S 9��y to Arona St.
INITIATING ACTION: This order was initiated by the Director of Public Works as
public necessity on the basis of one (1) complaint, a petition with one (1) signer and an
inspection of the walk.
EXISTING CONDITONS: This walk is poured concrete with tree heaves, water
pockets, asphalt patches, settled and cracked panels.
..............................................................................................
S9��� PROJECT: RECONSTRUCT SIDEWALK N.S. COMO AVE. from N. Hamline
Ave. to N. Pascal St.
INITIATING ACTION: This order was initiated by the Director of Public Works as
public necessity on the basis of two (2) complaints, a petition with one (1) signer and
an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water
pockets, asphalt patches, scaled, settled and cracked panels.
..............................................................................................
PROJECT: RECONSTRUCT SIDEWALK B.S. HOLTON ST. from W. Nebraska
59��6 Ave. to W. Arlington Ave.
INITIATING ACTION: This order was initiated by the Director of Public Works as
public necessity on the basis of three (3) complaints and an inspection of the walk.
EXISTING CONDITIONS: This walk is poured concrete with tree heaves, water
pockets, offgrade, asphalt patches and settled panels.
..............................................................................................
1
, ST. PAUL CI-1�Y COUNCIL � � ,�
�
PUBLIC HEARING N4TICE c, /�� �.
SIDEWALK CONSTRUCTION � al�5�
File No. 59016
Dear Property Owner: � City Council District ��4
Plannin District Council 4110
P U R POS E To consider the construction (new) and/or reconstruction of all or
part of the public sidewalk in front of your property. The limits
AN D of this pro�ect are:
Both �ides HOLTON STREET from West Nebraska Avenue
LOCATION to Arlington Avenue �
NOTE: Sidewalk reconstruction may consist of replacing from one panel
to all of the panels in front of your property. You may call
the phone numbers listed below to find out how many panels are
to be replaced.
Thursday, Apri1 1 , 1990, at 9 :00 a.m. .
HEARING city Council Chambers , Third Floor City Hall - Court House
------------------------.-----�-----=-----------------------
Please note that' the Pub13c Works Committee of the City Coui►cil�:�il�:'
discuss this item and develop a recommendation to the full City
Council. Please bring any unresolved concerns •that you may have to
. this meeting on Wednesday, Apri1 4; 1990 in City Council Chaiabers
Third Floor City Hall - Court Rouse at 9:00 a.m.
IN FO R MATIO N If the Council approves the orders (or any part thereof, a portion o
the costs will be assessed (after construction) against benefited
properties. You will only be assessed �for sidewalk work that abuts
your property. The estimated assessments for this pro3ect are as
, follows: � �
R'ECEIYED RESIDENTIAL rates (SINGLE FAMILY TO THREE FAMILY) :
�01�0 5-foot sidewalk
CITY CIERK New Construction
(where no walk existed) $13.00/front foot
. _ ST. PAUL C�I I Y t�UUNC�IL � ���
PUBLIC HEARING NOTICE �,.��
Gl
SIDEWALK CONSTRUCTION � a � �
File No. S9014 '
Dear Property Owner: City Council District 414
Plannin District Council /�10
P U R POS E To consider the construction (new) and/or reconstruction of all or
part of the public sidewalk in front of your property. The limits
A N D �f this project are:
Both Sides ALBANY AVENUE from N. Pascal Street to Arona
LOCATION Street �
NOTE: Sidewalk reconstruction may consist of replacing from one panel
to all of the panels in front of your property. You may call
the phone numbers listed below to find out how many panels are
to be replaced.
Thursday, Apri1 1 , 1990, at 9 :00 a.m. .
HEARING city Council Chambers , Third Floor City Hall - Court Houae
Please note that' the Public Works Committee of the City Couficil���ill'
discuss this item and develop a recommendation to the full City
Council. Please bring any unresolved concerns -that you may have to
this meeting on Wednesday, Apri1 4; 1990 in City Co�ncil Chainbers
Third Floor City Hall - Court House at 9:00 a.m.
IN FO R M AT10 N If the Council approves the orders (or any part thereof, a portion o
the costs will be assessed (after construction) against benefited
properties. You will only be assessed �for sidewalk work that abuts
your property. The estimated assessments for this project are as
, follows: � �
R'ErF�u�� RESIDENTIAL rates (SINGLE FAMILY TO THREE FAMILY) :
�3 O,(�� S-foot sidewalk
New Construction
CIT" l,�L:,.. (where no walk existed) $13.00/front foot
Replacement of old sidewalk $6.50/front foot
PLEASE NOTE: '
Reconstruction will be at the existing width. Public Works will
� reconstruct some existing sidewalk that is 6-feet wide down to
5 feet in all cases where this width is prACtical. This �maller
width is to keep the assessment at the lowest rate possible. In
the event you and your neighbors prefer the existing width and are
willing to accept the higher assessment rate, please contact the
Sidewalk Division at 298-4255 to request your preference. All
new sidewalks will be constructed 5-feet wide.
Rates for recc�nstruction of sidewalks wider than S feet are prorated.
For example: 6-feet wide sidewalk -- $7.80/front foot; 10-foot wide
sidewalk -- $13.00/front foot.
All corner residential properties will receive a credit up to the
• first 150 feet of new or reconstructed sidewalk along and abutting
the "long side" of the property.
COMMERCIAL rates (all property other than residential):
100 percent of actual cost estimated to be approximately $4.00
per square foot of walk constructed. If the property has area-
ways under the sidewalk that need to be eliminated, that cost
will be assessed in addition to the sidewalk assessments.
Please call 298-4255 for construction questions or 298-4513 (Voice or
Q U EST10 N S TDD) for assesment questions. Also, City staff will be available
to answer any last minute questions on the pro3ect in Room 218 City
Hall from 8:30 - 9:00 A.M. the same day as the hearing.
Notice sent March 30, 1990, by the Real Estate Division
Department of Finance & Management Services
Room 218 Citv Ha 55102 ourt House
Saint Paul, MN
�.._..��:..__ :.� .. .__:, , ,� .��r. .�a.a.�.e__
_:.��-���_,., , _ �. . >
. . ��' �`��
��� ����� �- � ��
��s�' � _�;.�;�5 , q;;
� � �+�'' r� `�/y, �)TY� Jg ��Y.�T r� �� ,i
,f '
�..�;, ��` '� .�• � <3 'PRELIIVIINARY OyR,,�rDER �jy���,�r s.eF
� �.'o`�9;t�iY 7..�' � . � : { i-��4 F�--it4-ig,���� ,..��fi�(.:ta'�(g�T+f.
���'`�'�`'iS7nr�L i..i' � ...,�: ,4 t..b � .j:a.' x-ev t���°���-,�i���G'q3��t`�i'�i�����ii'��:
Council File No 90-367—By Paula Maccabee �•�,x'£�St�'��i{���^xt,��.:� ��
�,oa' ,. _.,. • ••. �.:: ' �-a
`�In the Ma�ter of sidewalk recoristrucUon at therfollowing locations , �� ,.;
Votind Ward � ,�_ � . >` �, ' � �y} �'�, j
O .�.� t . r. .M �';��5-�i�Da�.t .� „'�'4"fk ;�~ "t35. T�R `' -�
4 ,;S90 14'Both sides Albany Ave;from N:Pascal'St�to Arona St: r�`°'y �.-;
,.seq, - , � ._. � a>-'- * r,- �. -+� �'`�S_#'n,�. 5.+}'�.i�k?k� � 'r'*t,�
4 S9Q 15 North side Coiho Ave from N Haznline Ave to N Pascal St. - .� :'� "'a
c�:'' �� x f�-�... . .: ` i..< s z:�.e� �e�^�.:•m�7r>�-1iR.W4 t:r 3 � ��k�- ,�
4,, 1S90 16.Both sides Holton St.from W,'Nebraska Ave to W Ar�ingto�Ave,�.. , ,
�ESTIMATED CONSTRUCI'ION,COSTS AND RATES,��`�,���,������� �g� .� �
�RESIDENTIAL rates SINGLE FAMILY TO 7'HREE FAMILY) . ' �� � �� :- "�
r; ,.,. _ _�- ; �;-��r w�:_`'�'�- ���� { - `� ;;
For�a 5 foot�de sidewalkc New Construction(where no walk e�dsfed) 818.00 per front I�
ft ;replacemFnt of old sidewalk;'56.50 per front ft Foi a'6 foot_wide;'sidewalk: New
�con'struction $15.60 per front ft^replacement of old sidewalk:S2.SU per,front ft.�- �.;:'
All corner'residential properties.will receive a credi�up�to�he flrst 150 feet of riew or ��
reconstructed sidewalk along and�abufUng�the lorig side"of the property��" " � !
,COMMERCIAi.'rates Call�propertyother than residential)100%of actuaal cost esUmafed ':
to be approximately S4 OO,per square ft ofwalk constructed{+°���'��'�s� ��-
-a •'T t c . . ,��: . �ti x r�...�� #�h:+r+k-3 3t' _.�^� �S+'-' '-�': ar.t�� .�. �
. • �r ^ ��
_ :Th�e CounMl ofxhe City,of,Saint Paul having received.the re�o�of the Mayor upon ;,;
the above improvement and having considered saic�repoi�hereby resolves�'"'%��
'';x��'1 Tha�xthe saCil report and ttie sanie�is heieby appr`o`�ied�wlt�i��alYe`�m���nd� I
�`that tYie estimated cost thereof is•see above for estimated constructlon costs financed'�
by assessments Y�+'-�`��.��'�"',��� � . ' ,,.,��.� >' . �=. "
sY ,��+v.J'- '+� ) v- aQ�ec�:��r x wJ-�.Ffi�w f�4- -� . .r -#�.
,�,,�2 That apublic hearingbehad on sald ltnprovemen on�the:l9th d ofA I 1
' at 9•'UO o clock a m`,in the�unqc�l�C(h�ya,mbers oyf the Ct Hall an our ouseBuildin�j
f �' �" *,-� kF:">x� ;C'.3 }k^'T'� �+ . x 'd'�+yE
in the City of Sain�,Paul � ��,���.�f r���y . ,���� ���
-3 That noqce;of sald public,hearing be given'�to the persons and in;the manner�
.+�t , f• �{
pro�ided by the Charter,�staUng the time and�lace ofrhearing;the`�n�a�ifre of the .�
imp`rovement and'the total cost theieof as estlmated�� , �
Fi1e�Nos S90 14 thru S90-16 = < r--� � '.�'��'�`�.��'7+���: ��x�'�, � �� `"
y . .� �'or �'A '. �' �..h,s �r7��;,� e�•{. t" r�,
.*�:' dopted by Council March 13, 1990 �� L � ` �,
�y j�►pProved by`Mayor March'`i4,`'1990"��y+ ���`' Y; �,;�,� �aj'r.,� ,���+
F.a �'-ti�.�` g$����°� �9 �r� �°r Sd'� i ,� '�: t �;�t
?r-t xS �$Sr`s� ¢`-�r'r'� 3' aeu�" �M'r.uCtl.`Z4 19�Q� �i�<r,,
e ���g�,
�x�°t•"•'° v'_�°��i^4+�tc.i^`,u ;:.,�c4. <'r, :t:,ds+o'".+�"��f. =:5..�'.
LrC._..._ L._`c — � -
� . ST. PAUL CI-I+Y C;C�UNCIL � c •��
PUBLIC HEARING NOTICE c%- �-
SIDEWALK CONSTRUCTION � 6_�5 �
Dear Property Owner: File No. S9015
City Council District �t4
� Plannin District Council ��10
P U RPOS E To consider the construction (new) and/or reconstruction of all or
part of the public sidewalk in front of your property. The limits
AND of this pro3ect are:
Nor�th side COMO AVENUE from North Hamline Avenue
LO CATIO N to North Pascal Street
NOTE: Sidewalk reconstruction may consist of replacing from one panel
to all of the panels in front of your property. You may call
the phone numbers listed below to find out how many panels are
to be replaced.
Thursday, Apri1 19 , 1990, at 9 :00 a.m. .
HEARING City Council Chambers , Third Floor City Hall - Court House
Please note that' the Public Works Committee of the City Cout�cil���Si11"
discuss this item and develop a recommendation to the full City
Council. Please bring any unresolved concerns •that you may have to
. this meeting on Wednesday, April 4; 1990 in City Council Chainbers
Third Floor City Hall - Court House at 9:00 a.m.
IN FO R M ATIO N If the Council approves the orders (or any part thereof, a portion of
the costs will be assessed (after construction) against benefited
properties. You will only be assessed �for sidewalk work that abuts
your property. The estimated assessments for this project are as
. follows: �
RESIDENTIAL rates (SINGLE FAMILY TO THREE FAMILY) :
RECEIVED
S-foot sidewalk
�(��QO New Construction
"��`� (where no walk existed) $13.00/front foot
CLTY CLERK
Replacement of old sidewalk $6.50/front foot
PLEASE NOTE: '
Reconstruction will be at tbe existing width. Public Works will
reconstruct some existing sidewalk that is 6-feet wide down to
5 feet in all cases where this width is pXACtical. This smaller
width is to keep the assessment at the lowest rate possible. In
the event you and your neighbors prefer the existing width and are
willing to accept the higher assessment rate, please contact the
Sidewalk Division at 298-4255 to request your preference. All
new sidewalks will be constructed 5-feet wide.
Rates for reconstruction of sidewalks wider than 5 feet are prorated.
For example: 6-feet wide sidewalk -- $7.80/front foot; 10-foot wide
sidewalk -- $13.00/front foot.
All corner residential properties will receive a credit up to the
• first 150 feet of new or reconstructed sidewalk along and abutting
the "long side" of the property.
COMMERCIAL rates (all property other than residential):
100 percent of actual cost estimated to be approximately $4.00
per square foot of walk constructed. If the property has area-
ways under the sidewalk that need to be eliminated, that cost
will be assessed in addition to the sidewalk assessments.
Please call 298-4255 for construction questions or 298-4513 (Voice or
QU ESTIO N S TDD) for assesment questions. Also, city staff will be available
to answer any last minute questions on the project in Room 218 City
Hall from 8:30 - 9:00 A.M. the same day as the hearing.
Notice sent �rch 30, 1990, by the Real Estate Division
Department of Finance 6 Management Services
Room 218 City Ha 55102 ourt House
Saint Paul, MN