D11581 White =City Clerk No. � I I J v �
Pink — Finance Dept. Q�� , I
Canary — Dept. Accounting Date v
Slue — Engineer
Green — Contractor
•
CITY OF SAINT PAUL — OFFICE OF THE MAYOR
ADMINISTRATIVE ORDER
for
CONTRACT CHANGE AGREEMENT N0. 6
ADMINISTRATIVE ORDER, Whereas, additions which proved to be necessary to the Improvement deacribed
88 MARSHALL-Hl�MLINE SEWER � PAVING PROJECT
,
Activit 9-S-8005
known as��29070 , City Project No.89-P-8021 Austin P. Keller Construction Comnanv ,
Contracta, is composed of the following:
Disposal of contaminated soil and rubble
encoi.mtered in Albert St. near Ma.rshall Ave. $8,948.58
Miscellaneous sidewalk � driveway patches,
sewer service repair at 1500 Carroll Ave. �4�22g,�2
• $13,177.30
ORDERED, That the City of Saint Paul, through its Maya, approves the foregoing adclitions made in ac-
cordance with the specit�cations in the sum of � 13,177.30 , said amoant to be added to the lump sum con-
� Activity#29070
sideration named in the contract, known as� , and which amount is to be finaaced from:
1989 CSSP Ftmding
APP OVED AS T OR
� 7-2�i9 /� ��ST� �. ��—/��,e. Co�s�. �a =--
�T
Assis t Ci Att�ney Contractor
�19 �� By
• ngineer
` ,� 19�.
Q hi gi eer Hea of Department o -Finance `
Z'r 19. ,r ,
Director of A Mayor
�O