ADMINI.STR TIVE ORDER, Whereas, additions which proved to be necessary to the Improvement described
as Arlingt' n/Western Sewer Separation Project
,
known as 29095, City Project No. 90-P-8,046 Rice Lake Contracting, In�.
Contracta, is com sed of the following:
l . Milling ' 2413 Sq. Yds. & $00. 90 = $ 2,171.70
2 . 8" Concr te - 27 .8 Sq. Yds. @ 25 . 00 = 695. 00
3 . 6" Conc ete - 237 .3 Sq. Yds @ 22 .50 = 5,339 .25
4. Sewer O fsets @ $500 .00 ( 3 ea. ) = 1,500. 00
5 . 10" DIP Catch Basin Lead - 131' @ $24.50 = 3,332 . 00
6 . 12" DIP� Catch Basin Lead - 367 ' @ $28 .10 = 10,312 .70
7 . Raise M nholes = 1,172 .61
• 8. Conflic with NSP - Electric Conduit = 238 . 87
9 . 12" San tary Sewer Replacement (Arundel) = 2,523 .40
10. Conflic with NSP Abandoned Gas Main = 875 . 00
(See Ex ibit A) Total of Change Order No. l: $28,160 . 53
ORDERED, hat the City of Saint Paul, through its Mayor, approves the foregoing adc�itions made in ac-
cordance with the specificationa in the sum of $ 2 8,16 0 _5 3, said amount to be added to the lump sum con-
� Activit #Zg095
sideration named ' the contract, known as���r , and which amount is to be financed from:
1990 CSSP' Ftmding
APP AS T O
-/s19 �/ l� f f-
As�istan ity ttabey - Contr c
�19 9� BY
E 'neer � �, /)
• _� 19 /1 �N` �---
� ngineer ead o epartment �f Fi ce
// 19 9�
Director of A inistrative Assistant to the Mayor
�O